Still left: During the VAB, the crawler transporter positions alone below Mobile Launcher 1 in preparation for rollout of SA-501 towards the launch pad – Be aware the worker inside the foreground for measurement comparison. Upon arrival in the Vertical Assembly Developing, Each and every stage was inspected within https://twitter.com/Ambiq_AI