Make sure the substrate is very well sealed and that every one hungry locations are addressed just before proceeding to setup the system. When the overcoating period of time with the primer is exceeded, the floor really should be evenly abraded and vacuumed right before further more coats are applied. https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/